Learn bits
Infrastructure
Mahesh

02/05/23 09:24 AM IST

India’s first cable-stayed Anji-Khad Rail Bridge

In News
  • The Anji-Khad rail bridge, India’s first cable-stayed rail bridge, is ready. The first bridge of its kind is made of 96 cables in total.
About Anji-khad Bridge
  • This is India's first cable-stayed rail bridge, which has 96 cables. The total length of cable strands is 653 km.
  • The bridge connects Katra and Reasi and required detailed geological investigations from IIT Roorkee and IIT Delhi to navigate the complex and fragile terrain of the
  • Himalayan mountain slopes.
  • Due to space restrictions on the Katra end, a special hybrid foundation was developed to stabilize the foundation of the main span.
  • To simplify construction and consider typical conditions, the 725.5-meter bridge was divided into four parts: the 120-meter-long ancillary viaduct on the Reasi side, a 38-meter-long approach bridge on the Katra end.
  • The main cable-stayed bridge with a length of 473.25 meters and a central span of 290 meters, and the 94.25-meter-long central embankment located between the ancillary viaduct and the main bridge, which connects tunnels T2 and T3 on the Katra-Banihal Section of the Udhampur-Srinagar-Baramulla Rail Link project.
  • It has an asymmetrical design, with a total deck width of 15 meters, and is supported by 96 cables with lengths ranging from 82 meters to 295 meters.
  • The main pylon utilized 40-meter-deep micropiles and a 20-meter hybrid well foundation.
  • Designed to withstand heavy storms with strong winds of up to 213 km/h, the Anji Khad Bridge can accommodate a single railway line and a 3.75-meter-wide service road, with a 1.5-meter-wide footpath on each side of the deck.
  • To ensure worker safety and increase efficiency while saving construction time, advanced equipment such as the DOKA Jump-Form Shuttering and Pump Concreting Systems have been utilized.
Source- India Today

More Related Current Affairs View All

17 Sep

Reasons Behind the heavy rain in Uttarakhand, Himachal

'Dehradun and several other districts in Uttarakhand have experienced very heavy rainfall over the past few days, triggering landslides in multiple areas and causing rivers to swel

Read More

08 Sep

Rajasthan’s coaching centre Bill

'The Rajasthan Coaching Centres (Control and Regulation) Bill, 2025, is a significant piece of legislation passed by the Rajasthan Assembly to regulate and oversee the state's burg

Read More

28 Aug

IADT-1

'Recently, the Indian Space Research Organisation (ISRO) successfully carried out its first Integrated Air Drop Test (IADT-1), a crucial milestone in the preparation for the countr

Read More

India’s First Ai-Driven Magazine Generator

Generate Your Custom Current Affairs Magazine using our AI in just 3 steps