Learn bits
Science & Tech.
Mahesh

05/03/24 11:02 AM IST

stage II of nuclear programme in India

In News
  • Recently, Prime Minister Narendra Modi witnessed the start of the process of core-loading the indigenous prototype fast breeder reactor (PFBR) at the Madras Atomic Power Station in Kalpakkam, Tamil Nadu.
About PFBR
  • The PFBR is a machine that produces more nuclear fuel than it consumes.
  • Its core-loading event is being hailed as a “milestone” because the operationalisation of the PFBR will mark the start of stage II of India’s three-stage nuclear power programme.
  • In the first, India used pressurised heavy water reactors (PHWRs) and natural uranium-238 (U-238), which contains minuscule amounts of U-235, as the fissile material.
  • In nuclear fission, the nucleus of an atom absorbs a neutron, destabilises, and breaks into two while releasing some energy.
  • If the destabilised nucleus releases more neutrons, the reactor’s facilities will attempt to use them to instigate more fission reactions.
  • The heavy water in PHWR – water molecules containing the deuterium isotope of hydrogen – slows neutrons released by one fission reaction enough to be captured by other U-238 and U-235 nuclei and cause new fission.
  • The heavy water is pressurised to keep it from boiling. The reactions produce plutonium-239 (Pu-239) and energy.
  • Only U-235, not U-238, can sustain a chain reaction but it is consumed fully in stage I. In stage II, India will use Pu-239 together with U-238 in the PFBR to produce energy, U-233, and more Pu-239.
  • The Department of Atomic Energy (DAE) set up a special-purpose vehicle in 2003 called Bharatiya Nabhikiya Vidyut Nigam, Ltd. (BHAVINI) to implement stage II.
  • In stage III, Pu-239 will be combined with thorium-232 (Th-232) in reactors to produce energy and U-233.
  • Homi J. Bhabha designed the three-stage programme because India hosts roughly a quarter of the world’s thorium.
  • The three stages are expected to allow the country complete self-sufficiency in nuclear energy.
Delay in PFBR
  • The fast breeder test reactor (FBTR) at Kalpakkam is a testing ground for PFBR technologies.
  • It was built by 1977 but sanctions against India’s ‘Smiling Buddha’ nuclear test forced the use of a mixed carbide fuel over enriched uranium (which France was to deliver).
  • The former lowered the power output and changed operating conditions.
  • By the time the Indian government green-lit the PFBR in 2003, most people who worked on the FBTR were also nearing or had completed retirement.
  • The Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam, designed the PFBR. Its original cost was Rs 3,492 crore and the original deadline, 2010.
  • Six years later, the DAE sought more funds and an extended deadline, which the government granted in 2012: Rs 5,677 crore and commercial operations by March 2015.
Working of PFBR
  • PHWRs use natural or low-enriched U-238 as the fissile material and produce Pu-239 as a byproduct.
  • This Pu-239 is combined with more U-238 into a mixed oxide and loaded into the core of a new reactor together with a blanket.
  • This is a material the fission products in the core react with to produce more Pu-239.
  • A breeder reactor is a nuclear reactor that produces more fissile material than it consumes.
  • In a ‘fast’ breeder reactor, the neutrons aren’t slowed, allowing them to trigger specific fission reactions.
  • The PFBR is designed to produce more Pu-239 than it consumes.
  • It uses liquid sodium, a highly reactive substance, as coolant in two circuits.
  • Coolant in the first circuit enters the reactor and leaves with (heat) energy and radioactivity.
  • Via heat-exchangers, it transfers only the heat to the coolant in a secondary circuit.
  • The latter transfers the heat to generators to produce electricity.
Small modular reactors
  • These reactor designs have a maximum capacity of 300 MW, require less land, and accommodate more safety features.
  • Several countries are developing SMRs to complement conventional [facilities] since SMRs can be installed at reduced cost and time by repurposing … infrastructure in brownfield sites.
  • Increasing SMRs’ contribution would require, among other things, amendments to the Atomic Energy Act (1962) “and other related statutes” to allow private sector participation “under the oversight of the AERB, with both nuclear fuel and waste controlled by the DAE.
Challenges
  • FBRs are harder to handle than other reactor designs, whereas the DAE has acquired an unfavourable public reputation over its often heavy-handed response to safety concerns.
  • Further, the civilian nuclear programme’s nodal regulatory body, the Atomic Energy Regulatory Body (AERB), was set up by executive order and reports ultimately to the DAE secretary.
  • In 2015, the International Atomic Energy Agency urged India to set up an independent statutory atomic regulator instead.
  • Finally, among other products, the thorium fuel cycle produces caesium-137, actinium-227, radium-224, radium-228, and thorium-230, which are all radioactive in ways that complicate their handling and storage.
Source- The Hindu

More Related Current Affairs View All

21 Sep

India Achieves Tier 1 Status in Global Cybersecurity Index 2024

' India has secured Tier 1 status in the Global Cybersecurity Index (GCI) 2024, published by the International Telecommunication Union (ITU).' The GCI is a comprehensive assessm

Read More

21 Sep

A new White Revolution

'Operation Flood, launched in 1970, ushered in the White Revolution and transformed the dairy sector in India.' Dairy cooperatives procured 660 lakh kg of milk per day in 2023-2

Read More

21 Sep

Changes in Canada’s international work permit system

'Canadian Prime Minister Justin Trudeau announced changes to the country’s international work permit system, aiming to reduce the number of immigrant workers in Canada.'

Read More

India’s First Ai-Driven Magazine Generator

Generate Your Custom Current Affairs Magazine using our AI in just 3 steps